Agenda Item
Meeting Date:
4/24/2019 - 7:00 PM  
Category:
SCHOOL FACILITIES MANAGEMENT  
Type:
Action  
Subject:
20.13 AWARD of CAPITAL Fund Construction Contract 3 of 5 Bid No. 6326 HVAC Work, CIP10813 “Restoration of Windows, Doors, Interiors, Security, Site and Asbestos Abatement” at School 5 to Mengler Mechanical, Inc. for the amount of $537,700.00 for a term of 365 calendar days.  
District Goals:
 
Enclosure:
 
File Attachment:
PS-5 10813 HVAC Low Bidder's Bid SHeet.pdf
PS-5 10813 HVAC Summary of Bids.pdf
BOCS PS-5 10813 MENGLER.xlsx
 
Rationale:
This resolution is to grant the administration the authority to enter into contract as described above. In compliance with General Municipal Law 103, bids were let and opened in public March 13, 2019. Bids were examined and all due diligence observed in determining the lowest responsive and responsible bidder.

A total of 3 bids were received with the highest bid at $654,047 and average bid of $505,826. The work was designed by Greenman-Pedersen, Inc. who estimated Contract 3 work be $386,100.

The first low bidder Hi-Tech Air Conditioning was deemed non-responsive by City of Yonkers Purchasing Department. After interviewing the second low bidder and confirming that they understood the scope of work, bids were found to be correct and have performed acceptably on YPS projects, the YPS, Engineer, Construction Manager and Schools Facilities Management are recommending award of this project to Mengler Mechanical, Inc. for the amount of $537,700.00, including bid Alternate 1.

Mengler Mechanical, Inc. originally submitted a bid in the amount of $566,000.00 (including Alternate 1) and were able to offer a concession for the HVAC Contract bid, reducing their bid (including Alternate 1) to $537,700.00.

CONTRACT 3 of 5, HVAC includes the replacement of exhaust fans, unit ventilators & alterations to heating piping for the gymnasium, cafeteria select toilet rooms.

Overall, CIP10813 includes but is not be limited to: new window & shades, select exterior door replacement, new PA system, cafeteria and select toilet room renovation, new high tech security system; exterior building lighting improvements; site improvements, gym HVAC & lighting and requisite asbestos abatement. The overall cost of this project is roughly $5 million.

The original bid included alternates for further renovation of the gymnasium including drainage, flooring, lighting, paint, wall padding and gym equipment. These alternates were rejected because they are beyond the reach of current budgeting.
 
Funding:
Pending Future BAN Sale  
Resolution
Ladies and Gentlemen:

WHEREAS: bids were issued for public advertisement and opened on March 13, 2019 in compliance with General Municipal Law for Bid No. 6326 HVAC Work, CONTRACT 3 OF 5 for the “Restoration of Windows, Doors, Interiors, Security, Site and Asbestos Abatement” at School 5 Project No. 10813, and

WHEREAS: such bids were duly examined and as a result of this examination of the bids submitted, the administration has determined that Mengler Mechanical, Inc., is the lowest responsive and responsible bidder with a bid of $537,700.00, including bid Alternate 1.

NOW THEREFORE BE IT RESOLVED: that Bid No. 6326 HVAC, Contract 3 of 5, for Project No. 10813 “Restoration of Windows, Doors, Interiors, Security, Site and Asbestos Abatement” at School 5 Project to Mengler Mechanical, Inc., 1689 Route 22, Brewster, NY 10509 in an amount not to exceed $537,700.00 for a term of 365 calendar days.
 
Approvals:
Recommended By:
Signed By:
John Carr - Executive Director
Signed By:  
Tom Collich - Purchasing Director
Signed By:  
Finance Department - Finance Reviewer
Signed By:  
Elizabeth Janocha - Deputy Commissioner
Signed By:  
John Liszewski - Commissioner
Signed By:  
Matthew Gallagher - Corporation Counsel
Signed By:  
Dr._Andrea_S. Coddett - Deputy Superintendent
Signed By:  
Dr. Edwin M. Quezada - Superintendent of Schools
 
Vote Results:

Original Motion
Member Kevin Cacace Moved, Member Pasquale Mondesando seconded to approve the Original motion 'Ladies and Gentlemen:

WHEREAS: bids were issued for public advertisement and opened on March 13, 2019 in compliance with General Municipal Law for Bid No. 6326 HVAC Work, CONTRACT 3 OF 5 for the “Restoration of Windows, Doors, Interiors, Security, Site and Asbestos Abatement” at School 5 Project No. 10813, and

WHEREAS: such bids were duly examined and as a result of this examination of the bids submitted, the administration has determined that Mengler Mechanical, Inc., is the lowest responsive and responsible bidder with a bid of $537,700.00, including bid Alternate 1.

NOW THEREFORE BE IT RESOLVED: that Bid No. 6326 HVAC, Contract 3 of 5, for Project No. 10813 “Restoration of Windows, Doors, Interiors, Security, Site and Asbestos Abatement” at School 5 Project to Mengler Mechanical, Inc., 1689 Route 22, Brewster, NY 10509 in an amount not to exceed $537,700.00 for a term of 365 calendar days.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 6 Nay: 0 Abstain: 1.
The motion Carried 6 - 0
   
Rev. Steve Lopez     Yes
Judith_Ramos Meier     Yes
Pasquale Mondesando     Yes
Edgar Santana     Abstain
Dr. Rosalba Corrado Del Vecchio     Yes
Andrea Brown     Yes
Kevin Cacace     Yes