Review Agenda Item
Meeting Date: 3/20/2019 - 7:00 PM
Category: SCHOOL FACILITIES MANAGEMENT
Type: Action
Subject: 21.4 AWARD of CAPITAL Fund Construction Contract for Bid No. 6354 HVAC Work, CONTRACT 2 OF 4, CIP10816 “Boiler System Replacement and Asbestos Abatement” at School 9 to Mengler Mechanical, Inc. for the amount of $987,000.00 for a term of 365 calendar days.
District Goals:
Enclosure
File Attachment:
PS-9 10816 HVAC LOW BIDDERS BIDS SHEET.pdf
PS-9 10816 HVAC SUMMARY OF BIDS.pdf
BOCS Mengler .xlsx
Rationale: AWARD of CAPITAL Construction Contract 2 of 4 for Bid No. 6354 HVAC Work CIP10816 “Boiler System Replacement and Asbestos Abatement” at School 9 to Mengler Mechanical, Inc. for the amount of $987,000.00 for a term of 365 calendar days.

This resolution is to grant the administration the authority to enter into contract as described above. In compliance with General Municipal Law 103, this contract was let for public and bids were opened in public and read aloud on February 15, 2019. Bids were examined and all due diligence observed in determining the lowest responsive and responsible bidder.

A total of 4 bids were received with the highest bid at $1,428,428 and average bid of $1,117,432. The work was designed by Eisenbach & Ruhnke Engineering, P.C. who estimated Contract 2 work be $1,000,000.

After interviewing the apparent low bidder and confirming that they understood the scope of work, bids were found to be correct, and references checked the Engineer, Construction Manager and Schools Facilities Management are recommending award of the subject contract.

This scope of CONTRACT 2 of 4, HVAC includes but not limited replacement of: the boiler heat plant, heating & ventilating units, exhaust fans, HVAC boiler controls flues and new chimney flues.

The overall scope of work for CIP10816 includes four separate construction contracts which include but is not necessarily limited to replacement of the boiler heat plant, unit ventilators, exhaust fans, HVAC controls, natural gas supply line, exterior lighting controls, the removal of existing underground fuel oil storage tank, library renovation and any related asbestos abatement work. The estimated cost for this work is $3.1 million and the actual four construction contracts to be recommended for award totals $2,803,888.26
Funding: TBD Pending BAN Sale
Resolution: Ladies and Gentlemen:

WHEREAS: bids were issued for public advertisement and opened on February 15, 2019 in compliance with General Municipal Law for Bid No. 6354 HVAC Work, CONTRACT 2 OF 4 for the “Boiler System Replacement and Asbestos Abatement” at School 9 Project No. 10816, and

WHEREAS: such bids were duly examined and as a result of this examination of the bids submitted, the administration has determined that Mengler Mechanical, Inc., is the lowest responsive and responsible bidder with a bid of $987,000.00.

NOW THEREFORE BE IT RESOLVED: that Bid No. 6354 HVAC Work, Contract 2 of 4, for Project No. 10816 “Boiler System Replacement and Asbestos Abatement” at School 9 to Mengler Mechanical, Inc., 1689 Route 22, Brewster, NY 10509 in an amount not to exceed $987,000.00 for a term of 365 calendar days.
Approvals:
Recommended By:
Signed By:
John Carr - Executive Director
Signed By:
Lee Pavone - Mechanical Engineer
Signed By:
Finance Department - Finance Reviewer
Signed By:
Tom Collich - Purchasing Director
Signed By:
Elizabeth Janocha - Deputy Commissioner
Signed By:
John Liszewski - Commissioner
Signed By:
Matthew Gallagher - Corporation Counsel
Signed By:
Dr._Andrea_S. Coddett - Deputy Superintendent
Signed By:
Dr. Edwin M. Quezada - Superintendent of Schools
Vote Results:

Original Motion
Member Kevin Cacace Moved, Member Pasquale Mondesando seconded to approve the Original motion 'Ladies and Gentlemen:

WHEREAS: bids were issued for public advertisement and opened on February 15, 2019 in compliance with General Municipal Law for Bid No. 6354 HVAC Work, CONTRACT 2 OF 4 for the “Boiler System Replacement and Asbestos Abatement” at School 9 Project No. 10816, and

WHEREAS: such bids were duly examined and as a result of this examination of the bids submitted, the administration has determined that Mengler Mechanical, Inc., is the lowest responsive and responsible bidder with a bid of $987,000.00.

NOW THEREFORE BE IT RESOLVED: that Bid No. 6354 HVAC Work, Contract 2 of 4, for Project No. 10816 “Boiler System Replacement and Asbestos Abatement” at School 9 to Mengler Mechanical, Inc., 1689 Route 22, Brewster, NY 10509 in an amount not to exceed $987,000.00 for a term of 365 calendar days.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0 Abstain: 2.
The motion CARRIED 5 - 0
   
Pasquale Mondesando     Yes
Rev. Steve Lopez     Yes
Andrea Brown     Yes
Edgar Santana     Abstain
Kevin Cacace     Yes
Dr. Rosalba Corrado Del Vecchio     Abstain
Dr._Ammir Rabadi     Yes