Review Agenda Item
Meeting Date: 3/20/2019 - 7:00 PM
Category: SCHOOL FACILITIES MANAGEMENT
Type: Action
Subject: 21.12 Assignment of CAPITAL Engineering services for CIP 10856 “Sewage & Sump Pump Replacement” at Museum School 25 under an existing Requirements Contract to Eisenbach & Ruhnke Engineering, P.C., under requirements Contract No. 619182 in an amount not to exceed $6,000.00 for a term of 365 calendar days.
District Goals:
Enclosure
File Attachment:
Res 17.5 1-20-2016.pdf
Res 22.27 6-19-2018.pdf
E&R Proposal.pdf
Rationale: Via Resolution 17.5 at their stated meeting on January 20, 2016 the Board of Trustees awarded a requirements contract to Eisenbach & Ruhnke Engineering, P.C. (E&R) for an amount not to exceed $1 million. This resolution is to assign the following specific work under that contract.

The Consultant will provide engineering services for the replacement of the sewage ejector pump and condensate sump pump located in the schools basement and adjacent to classrooms. The existing pumps have exceeded their useful life, require constant repair and require replacement. E&R will provide the design of the construction bid documents; assist with bidding & determination of responsive bidder, and construction administration.

The overall project cost is estimated to be $75,000 including bond fees.

Construction is anticipated to be performed during the summer of 2019.
Funding: B5525CP110856.B17C01.B2046A1620, $6,000.00, Local Capital Bonded Fund
Resolution: Ladies and Gentlemen:

WHEREAS: under Resolution 17.5 at the stated meeting on January 20, 2016, the Board of Education authorized the award of a requirements based, professional Architectural/Engineering services contract to Eisenbach & Ruhnke Engineering, P.C. in response to District RFQ313 “Architectural & Engineering Services for the School Facilities Management Department” for an amount not to exceed $1 million, and

WHEREAS: under Resolution 22.27 at their stated meeting on June 19, 2018 the Board of Trustees extended the requirements Contract No. 619182 to Eisenbach & Ruhnke Engineering, P.C. for an additional 12 months; and

WHEREAS: work as defined under that contract is required for “Sewage & Sump Pump Replacement” at Museum School 25 project; and

WHEREAS: the response by Eisenbach & Ruhnke Engineering, P.C. to request for proposals issued by the Facilities Department was deemed most advantageous to the District at a cost not to exceed $6,000.00, and

NOW THEREFORE BE IT RESOLVED: That the Superintendent of Schools is hereby authorized to appoint Eisenbach & Ruhnke Engineering, P.C., 291 Genessee Street, Utica, NY, 13501 to the task of providing professional Engineering services for capital project 10856 “Sewage & Sump Pump Replacement” at Museum School 25 for an amount of $6,000.00 and term of 365 days”.
Approvals:
Recommended By:
Signed By:
John Carr - Executive Director
Signed By:
Lee Pavone - Mechanical Engineer
Signed By:
Finance Department - Finance Reviewer
Signed By:
Tom Collich - Purchasing Director
Signed By:
Elizabeth Janocha - Deputy Commissioner
Signed By:
John Liszewski - Commissioner
Signed By:
Matthew Gallagher - Corporation Counsel
Signed By:
Dr._Andrea_S. Coddett - Deputy Superintendent
Signed By:
Dr. Edwin M. Quezada - Superintendent of Schools
Vote Results:

Original Motion
Member Kevin Cacace Moved, Member Pasquale Mondesando seconded to approve the Original motion 'Ladies and Gentlemen:

WHEREAS: under Resolution 17.5 at the stated meeting on January 20, 2016, the Board of Education authorized the award of a requirements based, professional Architectural/Engineering services contract to Eisenbach & Ruhnke Engineering, P.C. in response to District RFQ313 “Architectural & Engineering Services for the School Facilities Management Department” for an amount not to exceed $1 million, and

WHEREAS: under Resolution 22.27 at their stated meeting on June 19, 2018 the Board of Trustees extended the requirements Contract No. 619182 to Eisenbach & Ruhnke Engineering, P.C. for an additional 12 months; and

WHEREAS: work as defined under that contract is required for “Sewage & Sump Pump Replacement” at Museum School 25 project; and

WHEREAS: the response by Eisenbach & Ruhnke Engineering, P.C. to request for proposals issued by the Facilities Department was deemed most advantageous to the District at a cost not to exceed $6,000.00, and

NOW THEREFORE BE IT RESOLVED: That the Superintendent of Schools is hereby authorized to appoint Eisenbach & Ruhnke Engineering, P.C., 291 Genessee Street, Utica, NY, 13501 to the task of providing professional Engineering services for capital project 10856 “Sewage & Sump Pump Replacement” at Museum School 25 for an amount of $6,000.00 and term of 365 days”.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0 Abstain: 2.
The motion CARRIED 5 - 0
   
Rev. Steve Lopez     Yes
Pasquale Mondesando     Yes
Edgar Santana     Abstain
Andrea Brown     Yes
Kevin Cacace     Yes
Dr. Rosalba Corrado Del Vecchio     Abstain
Dr._Ammir Rabadi     Yes